St. James Academy

The Saint James Academy Campus Master Plan includes a high school for grades nine through twelve, a lighted football and track facility, a lighted soccer field, a baseball field, a softball field, a practice soccer field, and an outdoor wetland classroom. Schlagel & Associates, P.A. collaborated with Hollis & Miller Architects on the first phase which consisted of a 115,000 square foot building and the associated parking areas. Schlagel & Associates, P.A. then teamed with Sabatini Architects, Inc. on the second phase of the project which included a building addition of 15,000 square feet and additional parking areas. Schlagel & Associates, P.A. was responsible for the design and construction documents for the third phase which included a baseball and football stadium. In addition to the civil engineering site design, Schlagel & Associates was also responsible for obtaining the necessary permits from the Army Corps of Engineers to mitigate the impact on two existing wetlands. Schlagel & Associates incorporated an outdoor classroom opportunity within the design of water quality wetland feature. Schlagel & Associates was also responsible for the landscape design, which included a buffer planting plan along the south property line adjacent to a single family development. The overall campus landscape design contained a variety of plant material to provide the site with four-season interest.

Project Data:
  • Lenexa, Kansas
  • 45 acres, 165,000 s.f
Services:
  • Site Design
  • Storm Drainage Design
  • Landscape Design
  • ALTA Surveys
  • Topographic Surveys
  • Construction Staking
  • Preliminary & Final Plats